Electrical supply standards

Ausgrid's Electricity Supply Standards database

Electricity Supply Standards document the rules for all persons and organisations that connect to the Ausgrid network. Ausgrid will rewrite standards from time to time or make amendments using CIA documents or NSA documents.

StandardAmendments
pdf  Policy for ASP/1 Premises Connections, April 2014
240kb
This document provides details of design and construction requirements to assist connection applicants and Accredited Service Providers (ASPs) in understanding and satisfying their contractual obligations during a project to construct (or relocate) new infrastructure or premises connection assets.
pdf CIA1385 (25/03/2014)
ENOS Electricity Network Operations Standards

Superseded by NS238, Supply Quality as at 26/2/2014


This document is obsolete
pdf ES1 Premises Connection Requirements
470kb
N.B. Connection Application forms are now part of the NECF and are available from CIA1377.
pdf ES1 Permanent Disconnection Request (23/03/2016) pdf ES1 Applic for CT form (20/06/2013) pdf CIA 1377 (14/05/2013) pdf CIA1378 (20/06/2013) pdf CIA1389A (21/01/2015)
pdf ES1 Applic for CT Metering form Application for CT Metering Form
24kb
Applicable from June 2013
pdf ES1 (20/06/2013)
pdf  ES1 Permanent Disconnection Request
101kb
pdf ES1 (20/06/2013)
pdf ES3 Part A Metering Installations - Part A
820kb
This publication provides general information to assist with connection to Ausgrid’s
network and is now issued in two parts.

ES 3 Part A, Metering Installations provides general information to assist with connection of metering equipment to Ausgrid’s network.

ES 3 Part B Technical Specifications for Metering Equipment will contain technical documentation that was previously located in appendices for all metering equipment currently supplied by Ausgrid.
Reference drawings
- high res (individual drawings).
pdf CIA1392 (1/07/2015)
pdf ES3 Part B Metering Equipment Technical Description for Type 5 & Type 6 Metering Installations
5Mb
This publication provides general information to assist with connection to Ausgrid’s
network and is now issued in two parts.

ES 3 Part A, Metering Installations will contain all essential information for the connection of all metering within Ausgrid’s Network area.

ES 3 Part B Technical Specifications for Metering Equipment will contain technical documentation that was previously located in appendices for all metering equipment currently supplied by Ausgrid.
pdf CIA1394 (3/11/2016)
pdf ES4 Service Provider Authorisation
1Mb
ES4 sets out the mandatory requirements necessary to obtain Authorisation for individuals working for Accredited Service Providers (ASPs) to carry out contestable work on or near Ausgrid’s network system.
pdf CIA1391 (1/07/2015)
pdf ES7 Network Price Guide
1Mb
This publication explains the terms and conditions of Ausgrid’s Network Use of System (NUOS) tariffs. It does not address charges for alternative control services.
pdf  Deed of Agreement for Lease Ausgrid augmentation works
241kb
pdf  Deed of Agreement for Lease ASP1 Connections
241kb
pdf  Deed of Agreement for Easement ASP1 Connections
242kb
pdf  Directions for Signing a Deed
17kb
Directions for Signing Deeds of Agreement
pdf Network UG Policy Network Asset Relocation and Undergrounding Policy Guidelines
82kb
This publication outlines the standard Ausgrid policy for dealing with requests from local councils, resident groups or any other party to relocate (including underground) distribution power lines, in situations where these requests can be accommodated by Ausgrid
pdf  
0b
Temporarily Withdrawn
Ausgrid's ES 11 Requirements for Connection of Embedded Generators, July 2011, document
has been temporarily withdrawn from publication pending a complete review and update of this document. Any enquiries in the interim should be directed to email address: majorconnections@ausgrid.com.au