ENOS Electricity Network Operations Standards 147kb This publication describes Ausgrid’s objectives for its electricity network’s impact on the characteristics of electricity supplied by retailers to their customers through its electricity network. October 2011. | |
ES Index Index of Ausgrid Documents for Getting Connected to the Electricity Network 1Mb
| |
ES1 Customer Connection Information 1Mb
| CIA1376
(23/04/2013)
|
ES1 Form A Application for Connection (MS Word format) 360kb Applicable from July 2011 | |
ES1 Form A Application for Connection 112kb Applicable from July 2011 | |
ES1 Form B Supplementary Application for Connection 270kb Applicable from July 2011 | |
ES1 Form B Supplementary Application for Connection (MSWord format) 270kb Applicable from 20/09/2010 | |
ES1 Form C CT Metering Form 55kb Applicable from July 2011 | |
ES1 Form C CT Metering Form (MS Excel Format) 55kb Applicable from July 2011 | |
ES1 Form D ES1 Form D Power Quality Assessment Form (MS Wordformat) 27kb Applicable from July 2011 | |
ES1 Form D ES1 Form D Power Quality Assessment Form 27kb Applicable from July 2011 | |
ES1 PermDisc form Permanent Disconnection Request for Job Number 28kb
| |
ES3 Part A Metering Installations - Part A 1Mb This publication provides general information to assist with connection to Ausgrid’s network and is now issued in two parts.
ES 3 Part A, Metering Installations will contain all essential information for the connection of all metering within Ausgrid’s Network area.
ES 3 Part B Technical Specifications for Metering Equipment will contain technical documentation that was previously located in appendices for all metering equipment currently supplied by Ausgrid. | CIA1342
(22/09/2009)
CIA1344
(15/01/2010)
CIA1346
(17/02/2010)
|
ES3 Part B Technical Specifications for Metering Equipment 3Mb This publication provides general information to assist with connection to Ausgrid’s network and is now issued in two parts.
ES 3 Part A, Metering Installations will contain all essential information for the connection of all metering within Ausgrid’s Network area.
ES 3 Part B Technical Specifications for Metering Equipment will contain technical documentation that was previously located in appendices for all metering equipment currently supplied by Ausgrid. | CIA1342
(22/09/2009)
CIA1347
(18/02/2010)
|
ES4 Service Provider Authorisation 1Mb Describes the requirements needed to obtain Ausgrid authorisation and the scope of work Accredited Services Providers (ASPs) are permitted to carry out. | CIA1362
(20/04/2011)
CIA1366
(27/07/2011)
|
ES5 Charges for Network Miscellaneous & Monopoly Services 129kb Pricing for contestable work that is to be funded by customers. | CIA1356A
(29/11/2010)
|
ES7 Application of Network Use of System Charges 1Mb New Edition edition applies to all relevant applications and requests received on or after 1 July 2012. | CIA1371
(21/01/2013)
|
ES8 Capital Contributions Guidelines 469kb Describes charges when Ausgrid has to upgrade the network specification to meet the needs on one or a group of customers. | CIA1338
(6/03/2009)
|
ES9 Deed of Agreement for Easement 96kb Deed for property over which an easement is required | |
ES9 Directions for Signing a Deed 17kb Directions for Signing Deeds of Agreement | |
ES9 Agreement for Connection of Developments 135kb Agreement between Ausgrid, the developer and its level 1 ASP, covering the construction of proposed contestable connection works to the development. Deeds of agreement for easement and lease, associated with these developments, must be printed out and filled in, in accordance with the Directions for Signing a Deed document. | CIA1359A
(17/02/2011)
|
ES9 Deed of Agreement for Lease 92kb Deed for property over which a lease (and any associated easement) is required | |
ES9B Agreement for Small Asset Relocation Projects 100kb This publication contains the Agreement between Ausgrid and the Proponent for the carrying out of small asset relocation projects | |
NCP7 Application of Network Use of System Charges
Application of Network Use of System Charges
This document is obsolete, superseded by
ES7 | |
Network UG Policy Network Asset Relocation and Undergrounding Policy Guidelines 102kb This publication outlines the standard Ausgrid policy for dealing with requests from local councils, resident groups or any other party to relocate (including underground) distribution power lines, in situations where these requests can be accommodated by Ausgrid | |
ES10 Requirements for Electricity Connection to Developments 344kb The standards, specifications and general requirements applicable to supply to developments. | CIA1369
(4/04/2012)
|
ES11 ES11, Requirements for Connection of Embedded Generators 249kb This publication contains essential information and requirements relevant to applicants (Generators) proposing to connect or alter a connection of an embedded generating system to Ausgrid’s network for parallel operation. | |