This information pack applies to embedded generator (EG) connections that will follow the connection process regulated by Chapter 5A of the National Electricity Rules (NER), excluding those defined as micro-embedded generators. This process generally applies to generators with a capacity ranging from 30kW to 5MW that will not be registered with the Australian Energy Market Operator (AEMO).
A number of documents are included as part of this pack, accessible via the links in the drop down list below. The Non-Registered Embedded Generator Guideline provides a directory to these documents.