Technical Documentation

Technical drawings NS125

Technical drawings provide supporting documentation for Ausgrid's Network Standards.

186336-1   LV ABC Parallel Circuit Bonding Arrangements

206544-1   LV ABC Intermediate Construction on 500mm Standoff Bracket for 0° to 30° Deviation Angle 1-80

206546-1   LV ABC Intermediate Construction on 500mm Standoff Bracket for 30° – 60° Deviation Angle 1-83

206623-1   LV Open Wire to ABC Through Termination Construction with Links 1-89

206624-1   LV Horizontal Pin Construction with LV ABC Tee Off Construction 1-84

228823-1   HV, LV and Communications Crossarm Details

232175-1   LV ABC Offset Arm Construction for 0° to 30° Deviation Angle 1-81

234378-1   LV Through Termination 1-11 (A) For Maintenance And Legacy Replacements Only

251901-1   LV Conductor Termination Tie for Twin and Twist Conductors

251902-1   LV Conductor Side Tie for Twin and Twist Conductors

251903-1   LV Conductor Top Tie for Twin and Twist Conductors

513900-1   LV Horizontal Pin Construction 1-1

513901-1   LV Offset Arm Arrangement 1-2

513902-1   LV Angle Construction 1-3

513903-1   LV Termination Arrangement 1-10

513904-1   LV Through Termination Arrangement 1-11

513905-1   LV Corner Pole 4 way Through Construction 1-13

513906-1   LV Corner Pole (Tee-off) Termination Arrangement 1-14

513940-1   LV Corner Pole Termination Arrangement 1-12

513945-1   LV Railway Termination Construction 1-15

513962-1   LV Through Transposition Termination Construction 1-16

513971-1   LV Through Mains with Links 1-50

513981_1   LV ABC Intermediate for 0° to 30° Deviation Angle, 1-70

513981_2   LV ABC Intermediate Parallel Bonding Construction for 0° to 30° Deviation Angle, 1-70B

513982-1   LV ABC Termination Construction, 1-71

513983-1   LV Open Wire to ABC Through Termination Construction, 1-72

513995-1   LV Insulator and Pin Arrangement

514012-1   LV ABC Intermediate Construction for 30° – 60° Deviation Angle 1-73

514013-1   LV ABC Through Termination Construction 1-74

514013-2   LV ABC Through Termination Parallel Bonded Construction 1-74B

514014-1   LV ABC Corner Pole Construction 1-75

514015-1   LV ABC Through Mains Corner Construction 1-76

514016-1   LV ABC Through Termination Construction with Tee off 1-77

514017-1   LV ABC Intermediate Construction with Tee off 1-78

514052-1   LV ABC Through Termination Construction with Links 1-79

514070-1   LV Termination Construction and Underground Cable with Heatshrink Termination 1-105

514071-1   LV Termination Construction and Underground Cable with Heatshrink Termination and Links or Fuses 1-107

244670-1   LV ABC Offset Twin Arm Construction For 0° to 30° Deviation Angle 1-82    

565720_1   LV ABC Constructed on Conductive Poles Below High Voltage Supply