Technical Documentation

Technical drawings NS125

Technical drawings provide supporting documentation for Ausgrid's Network Standards.

514013_1   Standard Construction LV ABC Through Termination Construction, 1-74

514013_2   Standard  Construction LV ABC Through Termination Parrallel Bonded Construction, 1-74B

186336     Standard Construction LV ABC Parallel Circuit Bonding Arrangements

206544     Standard Construction LV ABC Intermediate Construction on 500mm Standoff Bracket for 0° to 30° Deviation Angle 1-80

206546     Standard Construction LV ABC Intermediate Construction on 500mm Standoff Bracket for 30° – 60° Deviation Angle 1-83

206623-1   Standard Construction LV Open Wire to ABC Through Termination Construction with Links, 1-89

206624   Standard Construction LV Horizontal Pin Construction with LV ABC Tee Off Construction, 1-84

228823   HV, LV and Communications Crossarm Details

232175   Standard Construction LV ABC Offset Arm Construction for 0° to 30° Deviation Angle 1-81

234378   Standard Construction LV Through Termination 1-11 (A) For Maintenance And Legacy Replacements Only

251901   Standard Construction LV Conductor Termination Tie for Twin and Twist Conductors

251902   Standard Construction LV Conductor Side Tie for Twin and Twist Conductors

251903   Standard Construction LV Conductor Top Tie for Twin and Twist Conductors

513900   Standard Construction LV Horizontal Pin Construction 1-1

513901   Standard Construction LV Offset Arm Arrangement 1-2

513902   Standard Construction LV Angle Construction 1-3

513903-1    Standard Construction LV Termination Arrangement 1-10

513904-1   Standard Construction LV Through Termination Arrangement 1-11

513905   Standard Construction LV Corner Pole 4 way Through Construction 1-13

513906-1   Standard Construction LV Corner Pole (Tee-off) Termination Arrangement 1-14

513940-1   Standard Construction LV Corner Pole Termination Arrangement 1-12

513945-1   Standard Construction LV Railway Termination Construction 1-15

513962-1   Standard Construction LV Through Transposition Termination Construction 1-16

513971-1   Standard Construction LV Through Mains with Links 1-50

513981_1   Standard Construction LV ABC Intermediate  for 0° to 30° Deviation Angle, 1-70

513981_2   Standard Construction LV ABC Intermediate Parallel Bonding Construction  for 0° to 30° Deviation Angle, 1-70B

513982   Standard Construction LV ABC Termination Construction, 1-71

513983-1   Standard Construction LV Open Wire to ABC Through Termination Construction, 1-72

513995   Standard Construction LV Insulator and Pin Arrangement

514012   Standard Construction LV ABC Intermediate Construction for 30° – 60° Deviation Angle, 1-73

514014   Standard Construction LV ABC Corner Pole Construction, 1-75

514015   Standard Construction LV ABC Through Mains Corner Construction, 1-76

514016   Standard Construction LV ABC Through Termination Construction with Tee-off , 1-77

514017   Standard Construction LV ABC Intermediate Construction with Tee-off, 1-78

514052   Standard Construction LV ABC Through Termination Construction with Links, 1-79

514070-1   Standard Construction LV Termination Construction and Underground Cable with Heatshrink Termination 1-105

514071-1   Standard Construction LV Termination Construction and Underground Cable with Heatshrink Termination and Links or Fuses 1-107

244670   Standard Construction LV ABC Offset Twin Arm Construction For 0° to 30° Deviation Angle, 1-82    

565720_1   Standard Construction LV ABC Constructed on Conductive Poles Below High Voltage Supply