Solar, batteries and embedded generation

Connecting non-registered embedded generators


If you are connecting an embedded generator with a capacity ranging from 200kW to 5MW, that will not be registered with the Australian Energy Market Operator (AEMO), follow the connection process below. The connection rules are regulated by Chapter 5A of the National Electricity Rules (NER).
 
A number of documents are included as part of this pack, accessible via the links in the drop down list below. The Non-Registered Embedded Generator Guideline provides a directory to these documents.