Safety alerts

We are committed to the safety of our ASPs and regularly communicate safety updates

20 Dec 2019 - SA24_19 COO Directive - Resumption of Stage 1 Live Work Tasks (Overhead and ELV)

12 Dec 2019 - SA23_19 Temporary operating restriction on Andelec ABB SD-series switches

10 Dec 2019 - SA22_19 Dislodged Substation Louvre Doors

06 Dec 2019 - SA20_19 Optus Hybrid Fibre Coaxial (HFC) Network Safety Hazard

02 Dec 2019 - SA19_19 Pole failure caused by change of pole loading

28 Nov 2019 - SA18_19 Electrical Hazards for Telecommunication assets after Storm Events

26 Nov 2019 - SA17_19 Schneider Chamber Type Transformer Lifting Hazard

15 Nov 2019 - SA16_19 High Voltage cables left on private property

29 Oct 2019 - SA15_19 Ausgrid's Confined Spaces Safety Update

29 Oct 2019 - SA14_19 Live Work Pause for Safety Update

30 Sep 2019 - SA13_19 Low voltage shorts applied to live distributor

13 Sep 2019 - SA12_19 Working near LV cables with metallic sheaths - Implementation of additional controls

10 Sep 2019 - SA11_19 Installation of Tiger Tails (Tarapoli Pipes) and Insulating mats_final

06 Sep 2019 - SA10_19 Update to temporary pause on work in underground pits

05 Sep 2019 - SA09_19 Temporary pause on work in underground pits

04 Jul 2019 - SA08_19 Further information regarding additional controls for Level 2 ASP's

28 Jun 2019 - SA07_19 Accessing Ausgrid Pits and-or Ducts

26 Jun 2019 - SA06_19 ISSC Testing of connections to low voltage electricity networks

18 Jun 2019 - SA05_19 v2 Live work Pause for Safety Level 1 Level 2 ASPs

08 Apr 2019 - SA04_19 Asbestos in electrical meters and relays

27 Mar 2019 - SA03_19 Accessing Service termination enclosure

11 Mar 2019 - SA02_19 Electric Shock During Low Voltage Changeover

15 Feb 2019 - SA01_19 ABB Safelink RMU - Missing earth bonds

Looking for something else?

Other useful resources

ASP and contractorsGeneral information noticesAusgrid authorisation