ES3 Part A

Metering Installations

ES3 Metering Installation Requirements Part A

This publication provides general information to assist with connection of metering equipment to Ausgrid’s network

Scope

This document outlines Ausgrid’s revenue metering installation requirements for all metered installations within the Ausgrid distribution area. The metering installation must also comply with the following requirements where applicable:

  • The National Electricity Rules
  • AEMO Metrology Procedure
  • AEMO Service Level Procedures for MPB’s and other associated AEMO procedures
  • Ausgrid’s Electrical Supply (ES) series of documents
  • Ausgrid’s Connection Policy, Connection Charges
  • The customers connection contract with Ausgrid (under NECF)
  • Deemed Standard Connection Contract
  • Service and Installation Rules of NSW
  • Ausgrid’s Network Standard (NS) series of documents
  • AS/NZS3000, The Wiring Rules
  • Code for safe installation of direct-connected whole current electricity metering in NSW
ES3 Part A: Metering Installation Requirements
Updated Apr 05, 2021
pdf
0.55MB

Looking for something else?